19,900 Cubic yards of concrete
The Herbert Hoover Dike modification is located in Lake Okeechobee, Florida. The C-5 construction project consisted of a new cast-in-place reinforced concrete structure. The structure included cast in place foundations and walls for the Headwalls and three encased 10-ft diameter steel-lined culvert barrels.